Light Rail Metro In Valencia

The first line of a planned four line system partially opened in November, 2006. The opened section is  6.2 k long, of which 4.7 km are underground.  There are 7 stations. Line one is expected to be completed in 2010, with another 4.5 km in length. Two additional lines are also currently under construction, with a fourth in the planning stages. Like the Caracas metro, Lines 2 and 3 are actually sections of Line 1 but are identified as two seperate lines. Once complete, they will form one continuous line and will become parft of Line 1, losing their identity and becoming one with the whole. This is known as the needs of the one outweighing the needs of the many.

Valencia metro's coaches may seem a bit familiar. If so, that may because they are the popular Siemens rolling stock used for many cities, such as St. Louis' Metrolink service.